Corkscrew Road Widening

The following work activities are scheduled to occur, weather permitting:

  • Through the week of February 14, Grande Oak Way (Grandezza) will be closed to vehicles to allow crews to install utilities under the roadway.  Residents and visitors must use an alternate access to enter/leave the community.  Crews will return at a later date to completely restore the roadway.
  • Through the week of February 21, Palermo Lake Court (Grandezza) will be closed to vehicles to allow crews to install utilities under the roadway.  Residents and visitors must use an alternate access to enter/leave the community.  Crews will return at a later date to completely restore the roadway. Palermo Lake Court will not be closed until crews have completed the crossing at Grande Oak Way.
  • FPL crews continue to remove and de-energize lines from Cypress Shadows Boulevard to Bella Terra Boulevard.
  • Pedestrians must use the temporary walkway on the south side of Corkscrew Road from Ben Hill Griffin Parkway to Stoneybrook Golf Drive.
  • Currently in the area between Wild Blue Boulevard and Cypress Shadows Boulevard (The Preserve at Corkscrew) vehicles are using temporary lanes on the north side of the road to allow crews to work on the south side of Corkscrew Road.
  • Turn lanes are currently unavailable at Midnight Blue Boulevard, Wild Blue Boulevard and Cypress Shadows Boulevard (The Preserve at Corkscrew).

Crews are installing curb, drainage, and sod, as well as performing earthwork, and relocating utilities. MOTORISTS ARE REMINDED TO OBEY THE POSTED SPEED LIMIT. Please use caution and watch for workers and construction vehicles entering and leaving the roadway. Estimated completion is fall 2023. Project cost is approximately $23 M. The contractor is Cougar Contracting, LLC. For further questions, please visit the project website at www.corkscrewroadwidening.com or contact Jennifer Dorning by email at Jennifer.Dorning@atkinsglobal.com or by phone at (239) 338-7723 after February 28.

Dorning states many people have asked about the different colors of the underground pipes.  Blue is for potable water, green is for sanitary sewer, black is for ductile iron pipe for water main, concrete pipe is for storm water, and purple is for reclaimed (not on this project).

Corkscrew Road Widening Project – Phase I Construction Project:  The project widens Corkscrew Road to six lanes from Ben Hill Griffin Parkway to Fire House Lane, and to four lanes from Fire House Lane to Bella Terra Boulevard.  The project includes adding on-road bike lanes, some sidewalk, and new drainage. Work begins this fall to construct a wildlife crossing approximately 1000 feet west of the entrance to Cypress Shadows Boulevard, which coincides with a regional flow-way that crosses Corkscrew Road at that location. Once the project is completed, the Village of Estero will be installing shared use paths, lighting, and landscaping.  Drivers, pedestrians, and bicyclists are urged to use extra caution when traveling through the work zone.  Please be aware of shifts in travel lanes and bike lanes, sidewalk detours, miscellaneous turn lane closures, and uneven pavement throughout the project.