Drivers, pedestrians, and bicyclists are urged to use extra caution when traveling through the work zone. 

  •  Motorists should expect lane closures during the nighttime/overnight hours of 8 p.m. to 5 a.m. for crews to work on storm sewer and force main crossings. Flaggers will be onsite to assist motorists.
  • Motorists should drive with caution and expect intermittent daytime flagging as road crews are performing earthwork up to the shoulders of the road on Corkscrew Road and Alico Road, within the project limits. Please be aware that trucks may be entering and leaving the roadway.
  • Crews will be installing drainage throughout the project area on the south side of Corkscrew Road. Motorists should expect trucks and equipment to be moving materials throughout the project.
  • A new traffic signal has been installed at the intersection of Corkscrew Road and Alico Road which became fully operational on Thursday, April 17. Motorists are urged to drive with caution.
  • Crews will be installing utility conduits and light pole bases on the south side of Corkscrew Road from Wayside Lane to Alico Road.
  • Sidewalks are closed in areas throughout the project as the contractor performs underground work.

 The work activities above are scheduled to occur, however unforeseen underground conditions and weather may affect this schedule. 

 Please use caution and watch for workers and construction vehicles entering and leaving the roadway. Estimated completion is spring 2026. Project cost is approximately $27 M. The contractor is Bergeron Land Development, Inc. For further questions, please visit the project website at https://corkscrewroadwidening.com or contact Jennifer Dorning by email at Jennifer.Dorning@atkinsrealis.com or by phone at (239) 338-7723.